The old trout ponds are situated a 5-minute walk upstream from the Pemberton Pool. Here they have remained buried and forgotten under thick vegetation for decades. SFFAC’s mission is to recover the ponds, promote the history and tourism values.
Our good friend and now club committee member Bruce Williamson brought to our attention the existence of the old ponds and their historical importance in early 2021. Bruce is a passionate fly fisherman and history buff, and his enthusiasm soon rubbed off on club members. The club began restoration work on May the 9th, 2021. This work was pivotal in galvanising our freshly formed club and providing direction and purpose. Our members, through many working bees since, and three successful community grants, have uncovered 90% of the old ponds and provided informative signage and a safe walking trail from Pemberton Pool. Our work continues today with many more tasks ahead. Busy bees normally run on the last Sunday morning of every month.
BRIEF HISTORY
These ponds represent a leap forward in the history of trout acclimatisation in Western Australia. Funded by the late John MacCallum Smith and built by the Pemberton-Warren Trout Acclimatisation Society with help from local community volunteers and mill workers, these two parallel sets of ponds and connecting races were gravity fed from a dam at the head. They founded the beginning of trout propagation independence for WA and removed the need of trapping wild fish or obtaining trout from Victoria, with the broodstock easily contained and controlled within these holding ponds.
As a result, angling tourism blossomed for Pemberton and the ponds were a popular attraction with regular hatchery tours for visitors. By the 1950s, problematic stream flows and the emergence of modern recirculation systems saw the need for a new hatchery facility being built at the site of the current Freshwater Research Station.
Follow the below link for more history by Bruce Williamson https://troutinthekarri.com
Works Begin May 9th 2021
Extract from Works Diary 🐝
Club Busy Bee 13th February 2022
Work begins on clearing the old dam wall
Club Busy Bee 25th February 2022
Club members expose the shallow channel between left hand race 1 & 2. Amazing the timbers buried in the mud have preserved so well.
Club Busy bee 13th March 2022
Sand bagging the 2 entry points in the dam wall to prevent races flooding from coming winter rains. The old brass plug was found in the first left hand pond. This was one of four which allowed each pond to be drained individually for cleaning purposes
Club Busy Bee 22nd April 2022
Concrete entrance to the old hut uncovered.
The original gate from the dam wall found buried in the mud. The gate still had the original lock and staple attached
Shire of Manjimup Community Grant funding
The club was successful with a community grant from the Shire of Manjimup and works commenced on 28th Oct 22. Tree loppers removed problematic trees from dam wall. Funding was also used for trail construction commencing on 2nd May 2023, connecting Pemberton Pool to the ponds.
Pemberton Trout Festival 6th Nov 2022
Poster courtesy of Recfishwest
Club Busy Bee 29th Jan 2023
A successful day with members pushing on, removing mud from the races. A few artifacts found and the drainage point to where our plug fits.
Club Busy Bee 4th Feb 2024
Club members removed fallen tree over the ponds.
Shire of Manjimup Community Grant Funding 27th April 2024
Funding enabled signage containing information and trail map to be installed at the Pemberton Pool.
Trail markers where also installed guiding visitors to the ponds
Recfishwest Community Grant 15 June 2024
This successful funding allowed us to install an informative sign at the ponds. Funds also used to complete trail and pedestrian markers.
Club Busy Bee 29 September 2024
With left hand races now clear we set our sights on the 2 remaining right hand races.
The Pemberton Trout Trail is a dynamic initiative brought to life through collaboration between the Southern Forests Freshwater Angling Club Inc. (SFFAC) and Freshwater Anglers Western Australia (FAWA). We are thrilled to share the progress and milestones achieved through this exciting project!
A Successful Start: Securing the Grant The journey began with a successful joint application for Native Forest Transition Grant funding. SFFAC is dedicated to enhancing accessibility and promoting sustainable angling and tourism opportunities in our region. With the installation of FAWA’s Angler Access Stiles at Thomson Flats, our club saw the potential to develop a connecting trail along this section of Lefroy Brook. Access to this area had long been lost due to invasive blackberry.
We were honoured to have Minister Jackie Jarvis MLC announce the grant at the Nannup Men’s Shed. A huge congratulations to Dr Russell Hanley and his FAWA team for their dedication and hard work in securing this crucial funding.
Phase 1: Clearing the Way Phase 1 began on 25 November 2024 and involved SFFAC supervising and working alongside a local contractor to clear the ground and provide access. In places, the old access trail was completely overgrown, and drainage channels requiring culverts had to be identified and addressed. For the first time in many years, we caught glimpses of the riparian zone and gained a sense of the challenges we faced. This access is crucial not only for spray contractor vehicles but also for developing a usable and long-lasting fishing trail.
Phase 2: Trail Construction Construction of the trail progressed steadily, with efforts focused on creating clear, safe and accessible pathways. The work involved brush cutting through thick blackberry brambles, which were up to nine feet tall in some places. Our aim was not only to identify and clear access to fishing locations along the brook but also to enable our spray contractor to achieve optimal coverage. This work extended along the entire length of the trail and required many volunteer hours to complete. It is a great testament to everyone involved and an achievement of which our dedicated club members can be very proud.
Phase 3: Blackberry Management Our local spray contractor was engaged on 26 December 2024 and required five days, with two operators, to complete a thorough chemical application along the entire trail. A follow-up application commenced on 9 November 2025. SFFAC members oversaw the work, ensured that all Schedule 6 permit requirements were met and excluded the public from areas being sprayed. Although the treatment took some time to produce a visible effect due to the permitted chemical type and low concentrations, the result was magnificent. The blackberry growth in the riparian zone was so thick that native plant biodiversity was almost non-existent. A few sparse, surviving clumps of sword grass and taller trees were all that remained. Blackberry had become the dominant plant species in this zone, and this was never more apparent than after we had eradicated it. Club members continue to monitor the trail and spot-spray any surviving canes and seedlings that appear.
From Vision to Reality The Pemberton Trout Trail became official on 30 August 2025, when SFFAC and FAWA held a joint busy bee to install trailhead signage and markers. This day represented a milestone for both organisations and provided an opportunity to reflect on all the hard work that had brought us to this point. The Honourable Jackie Jarvis MLC officially opened the trail at the Southern Forests Trout Festival on 13 October 2025 and praised everyone for their efforts.
Riparian Restoration Regular busy bees have seen SFFAC members donate hundreds of volunteer hours to restoring this riparian corridor. Ongoing trail development, spot-spraying weeds, whipper-snipping, brush-cutting and manual weed removal are just a few of the regular tasks. Armed with a five-year revegetation plan and a wealth of professional knowledge among club members, we are dedicated to restoring biodiversity along this stretch of the brook. We are under no illusion about the work ahead or the constant battle with weeds that will continue into the future. We are currently preparing three of our photo points for planting. This has involved eradicating a weedy sedge that invaded these now-barren zones. Manual seed-head removal and chemical application have removed this weed from those areas. Brush-cutting dead blackberry brambles to ground level is our final preparation before planting commences on 12 September 2026.
The Next Chapter With the initial grant funding for trail creation coming to an end, SFFAC and our partners are committed to ensuring that our five-year riparian restoration plan continues. We are exploring ways to secure funding and establish partnerships with both the community and commercial sectors. The potential of this project extends well beyond the trail’s initial purpose. We hope not only to successfully restore healthy biodiversity to this corridor but also to do so in a way that provides practical environmental education and community stewardship opportunities. The Pemberton Trout Trail is a testament to the power of collaboration and community-driven initiatives. As boots continue to hit the ground, we are excited to see this project develop. Stay tuned for further updates as we work to make the Pemberton Trout Trail a cornerstone of recreational angling in the Southern Forests region.
We proudly support The Australian Trout Foundation – WA Branch in their endeavours to increase public angler access throughout the southwest. These ATF stiles were achieved through a Recfishwest community grant and funded through the RFIF. The stiles allow passage over fence and through private land to reach the Lefroy Brook. Signage reminds anglers of their obligations whilst traversing private land.
The Thomson Flats stiles in Pemberton were installed by SFFAC members on the 18th of September 2022.
These stiles represent stage one of the Pemberton Trout Trail, a joint venture between SFFAC and the ATF (WA).
On the 2nd of October 2022, SFFAC members ventured to Harvey Dam to help with stile installation at the rear of the dam.
These stiles where made possible by funding from ALCOA.
On the 14th of October 2024 members installed a stile on the fence line at the Warren bridge with the owner’s permission. This allows easy access to the Treen Brook and the confluence with the Warren River. Recently this stile has been removed due to the paddocks being leased and fence up grades. We hope we can renegotiate this installation and have public access back again to this excellent fishery.
Congratulations to Russell and his ATF team for a very successful initiative and many thanks to the efforts of SFFAC members involved with installation works. We look forward working with the ATF (WA) in future installations. I encourage all to check out the ATF WA Branch Facebook page and become involved with a project near you. https://www.facebook.com/Forelle52/